§ 153.016  FEES.
   (A)   Fee requirement. The subdivider shall pay the village all fees and assessments as hereinafter required and at the time specified before being entitled to record a final plat or certified survey map. In planned developments, all fees and assessments must be paid prior to the issuance of any building permit.
   (B)   Preliminary plat review fee. The subdivider or developer shall pay a fee as provided in § 36.04 for each lot or parcel within the preliminary plat to the Village Administrator/Clerk at the time of first application for approval of any preliminary plats to assist in defraying the cost of review.  A reapplication fee as provided in § 36.04 for each lot or parcel shall be paid to the Village Administrator/Clerk at the time of reapplication for approval of any preliminary plat which has been submitted and previously reviewed within six months from the date of first application.
   (C)   Final plat review fee. The subdivider or developer shall pay a fee as provided in § 36.04 for each lot or parcel within the final plat to the Village Administrator/Clerk at the time of first application for approval of said plat to assist in defraying the cost of review.  A reapplication fee as provided in § 36.04 per lot or parcel shall be paid to the Village Administrator/Clerk at the time of reapplication for approval of any final plat which has previously been reviewed.
   (D)   Improvement review fee. The subdivider shall pay a fee as provided in § 36.04 of the cost of required improvements as estimated by the Village Engineer at the time of the submission of improvement plans and specifications to partially cover the cost of the village foe checking and reviewing such plans and specifications.  The fee may be recomputed upon demand of the Village Engineer, the subdivider, or the developer after completion of improvement construction in accordance with the actual cost of such improvements and the difference, if any, shall be paid by or remitted to the subdivider or developer.  Evidence of cost shall be in such detail and form as required by the Village Engineer.
   (E)   Inspection fee. The subdivider shall pay a fee as provided in § 36.04 to the village for such inspection as the Village Engineer deems necessary to assure that the construction of the required improvements is in compliance with the plans, specifications, and ordinances of the village or any other governmental authority.
   (F)   Engineering fee. The subdivider or developer shall pay a fee as provided in § 36.04 to the village for all engineering work incurred by the village in connection with the land subdivision, minor land division, or planned development.  In addition:
      (1)   Engineering work shall include the preparation of construction plans and standard specifications. The Village Engineer may permit the subdivider to furnish all, some, or part of the required construction plans and specifications. The fee for engineering work shall be billed periodically and shall be payable within ten days; and
      (2)   Inspection fees provided for in division (E) above.
   (G)   Legal fees. The subdivider or developer shall pay a fee as provided in § 36.04 for any legal work which may be undertaken by the village in connection with the land division or minor land division.  Legal work shall include all conferences regarding the subdivision or development and the drafting of contracts and agreements between the village and the subdivider.  Legal fees shall be billed periodically.
   (H)   Reserve capacity fee. The subdivider or developer shall pay the fees computed pursuant to § 153.050.
   (I)   Minor subdivision fees. The subdivider shall pay a fee as provided in § 36.04 at the time the certified survey map is submitted to assist in defraying the cost to review.  Prior to Village Board approval, the subdivider shall pay recording costs and any applicable fees as provided in divisions (G) through (H) above.
(Prior Code, § 18.11) (Ord. 03-2019, passed 2-14-2019)