§ 154.044 FINAL PLAT.
   (A)   The final plat shall be prepared by a South Carolina Registered Land Surveyor at the same scale and containing the same information, except for any changes or additions required by the Planning Commission, as shown on the preliminary plat, except that final finished contours and the resultant areas subject to inundation by a 100-year flood shall be shown. The preliminary plat may be used as the final plat if it meets these requirements and is revised in accordance with the requirements of the Planning Commission. All revision dates must be shown as well as the following:
      (1)   Name of owner of record;
      (2)   Name of subdivision, date, north arrow, and graphic scale;
      (3)   Name, registration number, and seal of registered surveyor or civil engineer;
      (4)   Name of municipality or county in which subdivision is located and location map;
      (5)   Sufficient data to determine readily and reproduce accurately on the ground the location, bearing, and length of every street and alley line, lot line, easement, right-of-way, boundary line, and building line whether curved or straight. This shall include the radius, point of tangent, and other data for curved property lines and curved streets, to an appropriate accuracy and in conformance with good surveying practice;
      (6)   Names of owners of record of all adjoining land and all property boundaries, water courses, streets, easements, utilities, and other such improvements, which cross or form any boundary line of the tract being subdivided;
      (7)   Exact boundaries of the tract of land being subdivided shown with bearings and distances;
      (8)   Streets and alleys, rights-of-way, percent of grades, and street names;
      (9)   Rights-of-way or easement; location, widths, and purposes;
      (10)   Lot lines, minimum building setback lines, and lot and block members;
      (11)   Parks, school sites, or other public open spaces, if any;
      (12)   All dimensions shall be to the nearest 1/10 of a foot and angles to the nearest minute; and
      (13)   Accurate description of the location of all monuments and markers.
   (B)   The following signed certificates shall appear on the final plat which is submitted to the Planning Commission by the subdivider.
      (1)   Certificate of accuracy.
“I hereby certify that the plan shown and described hereon is a true and correct survey to the accuracy required by the Newberry County Subdivision Regulations and the monuments shown have been placed to the specifications set forth in said regulations.”
   Date:   ________
   Registration No.:   _______
   Registered Land Surveyor:   __________
      (2)   Certificate of ownership and dedication.
“It is hereby certified that I am (we are) the owner (s) of the property shown and described hereon and that I (we) hereby dedicate all streets, alleys, walks, parks, rights-of-way and easements, and other sites to public or private use as noted.”
   Date:   ________
   Owner:   ________
   Owner:   ________
      (3)   The following signed certificate.
“I hereby certify that the streets, curbs, sidewalks, drainage system, sewer system and water system in _______ Subdivision as shown on the Plat dated ____, prepared by ______ has been installed in accordance with the preliminary plat (Construction Drawings) approved________.”
SEAL
   Registered Engineer:   ___________
(Ord. 105, passed 12-29-1988) Penalty, see § 154.999