§ 91.26 BASE COURSE.
   (A)   The base course work shall consist of crusher run stone or gravel not less than 6 inches thickness for bituminous surfacing.
   (B)   The base course work shall consist of crusher run stone or gravel of not less than 6 inches thickness for plant mix pavement constructed on a prepared sub-grade.
   (C)   After base course of 6 inches of crusher run stone or gravel has been applied, the minimum finish of asphalt shall be 1½ inches thick.
(Ord. 124, passed 9-17-1991; Am. Ord. passed 2-5-1997; Am. Ord. passed 11-5-1997; Am. Ord. passed 1-5-2000; Am. Ord. 07-37-03, passed 7-2-2003)