(A) The City of New Albany shall collect administration fees for plan review and site inspections associated with Stormwater Quality Management Plan (SWQMP) permit issuance as outlined below.
(B) (1) Fees shall be based on the amount of disturbed acreage associated with any proposed project. Applications will not be accepted for review without payment of the appropriate fee. The fees below shall include inspection for perimeter control, grading and stormwater quality management permits.
Residential Developments | Initial | Re-Submissions |
1 to 4 lots | $450 | $35 |
5 to 25 lots | $600 | $50 |
26 to 75 lots | $1,100 | $100 |
76 to 150 lots | $1,600 | $150 |
More than 150 lots | $2,600 | $250 sites w/ un-permitted construction underway two times the above |
Non-Residential Developments | Initial | Re-Submissions
|
Up to 5.0 acres | $600 | $50 |
5.1 to 10.0 acres | $1,300 | $120 |
10.1 to 25.0 acres | $2,100 | $200 |
25.1 or more acres | $2,600 | $250 sites w/ un-permitted construction underway two times the above |
(2) Disturbed acres are defined as the area of the project in which the surface of the land is disturbed by excavations, embankments, land development, residential lot construction, mineral extraction and moving, depositing or storing of soil, rock, earth or other earthmoving activity.
(C) Applications will not be accepted for review without payment of the appropriate fee, as collected by city staff and as directed by the Stormwater Board.
(D) Contracted services shall be compensated for plan review and inspections administered on behalf of the city as outlined below.
Residential Developments | Initial | Re-Submissions |
1 to 4 lots | $350 | $35 |
5 to 25 lots | $500 | $50 |
26 to 75 lots | $1,000 | $100 |
76 to 150 lots | $1,500 | $150 |
More than 150 lots | $2,500 | $250 |
Non-Residential Developments | Initial | Re-Submissions |
Up to 5.0 acres | $500 | $50 |
5.1 to 10.0 acres | $1,200 | $120 |
10.1 to 25.0 acres | $2,000 | $200 |
25.1 or more acres | $2,500 | $250 |
(Ord. G-07-10, passed 3-22-2007)