(A) Electric and telephone service shall be provided within each subdivision. Gas service may be required where reasonably accessible. Telephone, electric and street lighting wires, conduits and cables shall be constructed underground except in cases where the City Manager determines that topographic, bedrock or underground water conditions would result in excessive costs to the sub-divider.
(B) Overhead utility lines, where non-existent and where permitted, shall be located in an area mutually agreed to by the City Manager, utility company and sub-divider. The width of the easement per lot shall be not less than ten feet and the total easement width shall be not less than 20 feet.
(C) Whenever any two or more of the following: water line, storm water line, sanitary sewer line, electric line or telephone line are placed underground in the same utility easement, the total easement width shall be not less than 20 feet.
(D) Whenever a major gas transmission line is on or adjacent to property proposed to be subdivided, adequate measures shall be taken to ensure that all buildable sites are at a minimum safe distance from the transmission line easement, as recommended by the gas transmission company and the State Public Utilities Commission, hereinafter referred to as “PUCO”.
(Prior Code, § 23.06.06) Penalty, see § 151.999