§ 153.09  STORMWATER PLAN MODIFICATION.
   (A)   If the request for a plan modification is initiated before construction begins, the stormwater plan must be resubmitted and reviewed according to the procedures contained in § 153.07.
   (B)   If the request for a plan modification is initiated after construction is underway, the Borough Engineer shall have the authority to approve or disapprove the modification based on field inspection provided:
      (1)   The requested changes in stormwater controls do not result in any modifications to other approved borough land use/development requirements (e.g., building setbacks, yards and the like); and
      (2)   The performance standards in § 153.02 are met. Notification of the Engineer’s action shall be sent to the Borough Council which may issue a stay of the plan modification within five days and require the permitted to resubmit the plan modification for full stormwater plan review in accordance with § 153.07.