§ 154.81 UTILITIES.
   (A)   Location. All utility facilities existing and proposed throughout the subdivision shall be shown on the preliminary plat. Underground service connections to the street property line of each platted lot shall be installed at the subdivider's expense.
   (B)   Easements.
      (1)   Easements centered on rear lot lines shall be provided for utilities (private and municipal) and such easements shall be at least 15 feet wide. Proper coordination shall be established between the subdivider and the applicable utility companies for the establishment of utility easements established in adjoining properties.
      (2)   When topographical or other conditions are such as to make impractical the inclusion of utilities within the rear lot lines, perpetual unobstructed easements at least ten feet in width shall be provided along side lot lines with satisfactory access to the road or rear lot lines. Easements shall be indicated on the plat.
(Ord. 2005-6, § 5.7, passed 9-20-05)