§ 151.045 PART JOBS.
   When one master electrician completes the rough work, in whole or in part, on any electrical wiring or installation of fixtures or equipment, and a second master electrician is called upon to complete the work, a separate permit is required, for which regular fees shall be paid for work to be done. The Electrical Inspector shall inspect the subject premises before a second or subsequent permit is issued to determine whether the work previously performed meets all applicable standards. If the Electrical Inspector finds defects or substandard work or wiring, such defects or substandard work or wiring shall be corrected before new work may begin under a second or subsequent permit. Upon issuance of the second or subsequent permit, the Electrical Inspector shall seek to notify any previous permittee of such second or subsequent permit. No refund of fees shall be allowed in cases where multiple permits are issued.
(`87 Code, § 30-30)