The Director of Public Works/City Engineer will require inspection of the construction before concrete is poured and after forms and reinforcement steel is in place. This will assure construction is in accordance with the specifications and grade established by the city, therefore, and until such is done, utilities will not be permitted to be connected to the building or lot. Concrete poured prior to inspection will not be accepted.
(`87 Code, § 20-57) (Ord. passed 8-4-64; Am. Ord. 1990-3, passed 2-6-90; Am. Ord. 1996-17, passed 12-3-96; Am. Ord. 2002-29, passed 3-5-02)