When backfilling of the excavation and restoration of the paving surface has been completed, all surplus construction materials, equipment, scraps, broken pipe, debris and rubbish shall be removed, and the site shall be left in a clean and neat condition.
(`87 Code, § 20-35) (Am. Ord. 1988-2, passed 3-29-88)