(A) Upon request of any individual owner or developer of a platted lot or lots within the city Pleasant and upon the approval of the City Engineer, the city may investigate the practicability of extending water and/or sanitary sewer mains and necessary appurtenances to platted lot to lots for which request is made. Subdivisions shall comply with Chapter 154 of this code of ordinances. The owner or developer shall pay the total cost of installation for utility services. Total cost shall be defined as to include engineering, surveying and construction costs.
(B) If the owner or developer decides to proceed with the project based on an engineer's estimate, a written request shall be submitted to the city, along with a complete set of plans and specifications.
(C) The City Engineer may then authorize the owner or developer to have the project performed under a private contract. The city shall approve the contractor and shall inspect the construction project to insure that work is performed in conformity with standards and specifications provided by the engineer. The owner or developer shall be responsible to the private contractor for all costs associated with the construction of the project.
(`87 Code, § 24-81) (Ord. 1984-15, passed 12-4-84; Am. Ord. 1985-5, passed 3-5-85; Am. Ord. 1995-2, passed 1-10-95; Am. Ord. 2002-30, passed 3-5-02)
Cross-reference:
Subdivisions, see Ch. 154