(A) | At a minimum, provide dates of approval to the town's Field Engineer for each of the following elements of each drainage system: | |
(1) | Pond bank and slope stabilization; | |
(2) | Outfall stabilization; | |
(3) | Cleaning of drainage system; and | |
(4) | Video inspection and review. | |
(B) | At a minimum, provide hard copies of appropriate documentation of activities to the stormwater construction inspector for each of the following elements: | |
(1) | Project specifications; | |
(2) | Compaction testing records; | |
(3) | Correction of defects/problems (if any); | |
(4) | Details/records of major infrastructure changes; | |
(5) | Copy of inspection log for erosion control devices and infrastructure inspections (pipe and underdrains); and | |
(6) | BMP maintenance schedule and inspection forms. | |
(C) | At a minimum, provide dates of approval to the town's Field Engineer for each of the following elements of each street system: | |
(1) | Subgrades; | |
(2) | Curb and gutter; | |
(3) | Base; | |
(4) | Paving; | |
(5) | Traffic control devices and street signs; | |
(6) | Cleaning of streets; and | |
(7) | Lot benchmark and other marker placement. | |
('81 Code, § 154.59) (Ord. passed 6-9-92; Am. Ord. 99055, passed 11-9-99; Am. Ord. 00035, passed 7-11-00; Am. Ord. 02045, passed 7-9-02; Am. Ord. 07045, passed 8-14-07; Am. Ord. 13027, passed 6-11-13)