This form is to be completed by the applicant or the applicant’s representative and submitted with plans.
Name of Subdivision: ________________________________________________________________________
Name of Neighborhood: ______________________________________________________________________
Phase/Section Information: ____________________________________________________________________
Inspecting Professional: ______________________________________________________________________
Inspecting Certification: ______________________________________________________________________
Date: ________________ Phone: ________________
FINAL PLAT INSPECTION CHECKLIST FOR SUBDIVISION – DRAINAGE | |
Description
|
Date Approved by Field Engineer
|
Underdrains installed. | |
Street(s). | |
Drainage system installed per plans. |
FINAL PLAT INSPECTION CHECKLIST FOR SUBDIVISION – DRAINAGE (Continued) | |
Description
|
Date Approved by Field Engineer
|
FINAL PLAT INSPECTION CHECKLIST FOR SUBDIVISION – DRAINAGE (Continued) | |
Description
|
Date Approved by Field Engineer
|
System. | |
Culverts and inlets installed per plans. | |
Erosion control installed per plans. | |
Pond and outfall slopes converted and stabilized. | |
Outfalls–headwalls complete and grouted. | |
Lot drainage provided and stabilized. | |
Drainage system cleaned. | |
Stormwater video inspection received. | |
Stormwater video inspection reviewed. | |
Defects/damages repaired. | |
Stormwater bond received. | |
FINAL INSPECTION – END OF WARRANTY PERIOD – DRAINAGE
| |
Description | Date Approved by Field Engineer |
FINAL INSPECTION – END OF WARRANTY PERIOD – DRAINAGE
| |
Description | Date Approved by Field Engineer |
Erosion control in place. | |
Pond and outfall slopes stabilized. | |
Inlets and culverts undamaged. | |
Culverts and inlets free of silt. | |
Culverts and inlets cleaned. | |
Outfalls clear. | |
Stormwater video inspection received. | |
Stormwater video inspection reviewed. | |
Defects/damages repaired. | |
As-built/Engineer’s inspection received. | |
Stormwater pond/BMP maintenance data received. | |
FINAL PLAT INSPECTION CHECKLIST FOR SUBDIVISION – STREETS
| |
Description | Date Approved by Field Engineer |
FINAL PLAT INSPECTION CHECKLIST FOR SUBDIVISION – STREETS
| |
Description | Date Approved by Field Engineer |
Street and curbing cleaned. | |
Street(s). | |
Street signs in place. | |
Stop signs and other traffic control devices in place. | |
Sidewalks. | |
Paving and base laboratory data provided as required. | |
Lot corners visible. | |
Street markers visible. | |
Benchmarks in place. | |
Buffer markers visible. | |
As-built plans. End of S/D checklist. | |
Donor's and contractor's names. | |
E-911 verification of street names. | |
Field Engineer's completion certification. | |
Water and sewer operating permits. | |
Erosion control in place. | |
Street signs in place. | |
Pavement free from damage. | |
Curbing free from damage. | |
Buffer areas marked. | |
Utilities buried. | |
Sidewalks. | |
FINAL INSPECTION CHECKLIST FOR SUBDIVISION – TREES
| |
Description | Date Approved by Site Planner |
Replacement of tree survey submitted. | |
Replacement trees field verified. | |
OR | |
Fees-in-lieu received. |
('81 Code, § 154.50) (Ord. passed 6-9-92; Am. Ord. 99055, passed 11-9-99; Am. Ord. 00035, passed 7-11-00; Am. Ord. 00063, passed 1-9-01; Am. Ord. 02045, passed 7-9-02; Am. Ord. 07045, passed 8-14-07; Am. Ord. 13027, passed 6-11-13)