§ 51.076 CONNECTION INSPECTION.
   The applicant for a building water connection permit shall notify the Manager when such water connection is ready for inspection before connecting to the water system. Such connection and testing, as deemed necessary by the Manager, shall be made under the supervision of the Manager.
(Ord. 11011, passed 2-8-11)