The connection of a building into a water system shall conform to the requirements of the applicable building and plumbing code, Commission guidelines for development, and the procedures set forth in appropriate specifications of the ASTMN or the AWWA. The connections shall be made watertight and verified by proper testing. The Commission shall have the authority to develop, adopt, and amend guidelines relative to construction and use of the Commission's wastewater system. The guidelines for development and water specifications so adopted (and as may be amended from time to time) are incorporated into and made a part of this chapter. And deviation from the prescribed procedures and materials must be approved, in writing, by the Manager before installation.
(Ord. 11011, passed 2-8-11)