8-1-4: CONNECTIONS; PERMITS; FEES:
   A.   No connection to the Village water system shall be made without a permit being issued therefor and twenty four (24) hours' notice having been given to the Village. All such connections shall be made under the supervision of the Village and no connections shall be covered until the work has been inspected by the Village or the person authorized by it. Applications for such connections shall be made to the Village Clerk and shall be accompanied by the appropriate fee based upon the following fee schedule for each such connection:
 
Pipe Size
(Inches)
Fee
   3/4 - 1
$ 250.00
   11/4 - 3
500.00
   4 - 6
700.00
   7 - 8
1,000.00
   9 - 13
1,500.00
   14 - 16
2,000.00
 
   B.   In addition to the fee as set forth in the above referenced schedule, there shall be an additional hookup fee of five hundred dollars ($500.00) for any new construction hookups to the waterworks system extension along Mud Creek Road east of Nancy Street to Leaf River Road and east along Illinois Highway 64, said waterworks extension project, being more fully described in ordinance 7-1-99 available for inspection in the Office of the Village Clerk. (1979 Code § 7-4-3)