(A) Protective barricades shall be placed around all trees designated to be saved, prior to the start of development activities or grading.
(B) Protective barricades shall remain in place until development activities are complete. The area within the protective barricade shall remain free of all building materials, stockpiled soil or other construction debris. Construction traffic, storage of vehicles and materials and grading shall not take place within the protective areas of the existing trees.
(C) A tree protection plan shall be submitted with the landscape plan as part of the construction documents showing how the trees will be protected from the land disturbing activities.
(Ord. passed 5-13-1996)