§ 51.36 TO BE MADE WITHIN 30 DAYS AFTER MAIN IS READY FOR USE.
   Within 30 days after the time when any water main in any street is completed and ready for use, the owner of every abutting lot whereon water is supplied for human use shall cause the lot to be connected with the water main. Within 30 days after the time when any sewer main in any street is completed and ready for use, if a water main has also been installed in such street, the owner of any abutting lot having thereon improvements for human occupancy shall cause a water closet and sink to be installed and to be connected with such sewer main, and shall cause all other sewer facilities within such improvements, if any, to be connected with the sewer main; provided, however, that the owner of the premises shall be notified in writing by the city of the installation of the water main or the installation of the sanitary sewer, and shall be allowed 30 days after such written notice within which to make the required connection.
(Code 2019, § 19-13) (Code 1961, § 18-4)