§ 154.365  GENERAL REQUIREMENTS.
   The design shall be accomplished under the direction of a registered professional engineer. The design shall also be based on land use in the tributary area as zoned, actually developed or indicated by an adopted future land use plan, whichever basis produces the greatest runoff.
(1999 Code, § 34-5-60)