§ 54.06 DEMAND METERS.
   All connected loads of 50KW or more, except irrigation pumps and sugar beet dumps, shall be on demand meters.
(1979 Code, Ch. 10, § 1(E)) (Am. Ord. D-225, passed 4-8-2003)