§ 155.342 CONSTRUCTION SUBJECT TO GEOLOGIC OR FLOOD HAZARDS.
   (A)   Report required. Whenever development or construction is or may be subject to geologic or flood hazard, the Planning Commission and/or County Engineer may require the applicant to submit a geologic and soils survey report prepared by a qualified professional team.
   (B)   Special conditions. When such report indicates a lot to be subject to unusual, potential or actual geologic hazards, the applicant shall meet the special conditions required by the Planning Commission and/or County Engineer or other designated party to reduce or eliminate such hazard, or if such conditions cannot be met or will not be met, the application for a building or conditional use permit shall be denied.
(Prior Code, § 8-6-34)