Chapter
General Provisions
52.01 Purpose; policy
52.02 Definitions
52.03 Abbreviations
Use of Public Sewers
52.10 Mandatory sewer connections
52.11 Unlawful discharge to storm sewers or natural outlets
52.12 Compliance with local, state and federal laws
52.13 Discharge of unpolluted waters into sewer
52.14 Prohibited discharges
Private Wastewater Disposal
52.20 Public sewer not available
52.21 Requirements for installation
Building Sewers and Connections
52.25 Permits
52.26 Prohibited connections
52.27 Design and Installations
52.28 Inspection
Pollutant Discharge Limits
52.30 General conditions
52.31 Restricted discharges
52.32 Dilution of wastewater discharge
52.33 Grease, oil and sand interceptors
52.34 Special industrial pretreatment requirements
52.35 Hauled wastewaters
52.36 Protection from accidental and slug discharges
52.37 State requirements
52.38 City's right of revision
52.39 Federal categorical pretreatment standards
Pretreatment Program Administration
52.45 Wastewater discharges
52.46 Industrial user permits
52.47 Permit modifications
52.48 Permit conditions
52.49 Alternative discharge limits
52.50 Permit duration
52.51 Permit transfer
52.52 Compliance data reporting
52.53 Periodic Compliance Reports
52.54 Permit violations
52.55 Monitoring requirements
52.56 Inspection; sampling
52.57 Pretreatment
52.58 Annual publication
52.59 Significant non-compliance
52.60 Confidential information
52.61 Signatory Requirements
Sewer Charges, Fees and Surcharges
52.70 Purpose
52.71 Tap fees
52.72 Charges and fees
52.73 Fees applicable to hauled wastes
Powers and Authority of Inspectors
52.80 Right to enter premises
52.81 Right to obtain information regarding discharge
52.82 Access to easements
52.83 Safety
Enforcement
52.90 General
52.91 Notice of Violation
52.92 Administrative Orders
52.93 Show cause hearing
52.94 Additional enforcement remedies
52.95 Enforcement response plan
52.99 Penalties
Appendix A:
Table I. Effluent Discharge Limitations