If a sidewalk is not repaired within thirty (30) days after service of the notice required in § 54.54, the Public Works Director, or his or her designee, shall arrange for the repair of the sidewalk. The Public Works Director shall keep a record of the total cost of the repair attributable to each lot or parcel of property and report that information to the City Clerk-Treasurer.
(Ord. 405, passed 4-5-2011)