1173.20 DEMOLITION OF CERTAIN BUILDINGS.
   Except in cases of emergency or as otherv,ise agreed in writing by the Village Manager, when a building is demolished within the Village the following procedures shall be used:
   (a)    The owner or contractor must notify the Village and complete any required application and pay any required application fee.
   (b)    All utilities must be safely disconnected by authorized and qualified persons.
   (c)    The owner must remove material and concrete down to at least a depth of five (5) feet, haul away excess material, clean the site, use suitable fill, and compact the site to minimize settling.
   (d)    The owner must take responsible measures to minimize damage to sidewalks and will be responsible for replacement or repair of damaged sidewalks.
   (e)    The property owner will be responsible for seeding the site.
   (f)    All demolition must be completed within one (1) month from start of demolition. Grading and backfill must be completed within six (6) months from the start of the demolition.
   (g)    The owner must comply with all applicable federal and state regulations pertaining to asbestos and lead paint remediation.
   (h)    All material removed will be the responsibility of the property owner and must be hauled to an approved landfill. The Village dump will not accept any material from the demolition.
      (Ord. 2257. Passed 11-8-21.)