9-1-6-7: FCC REPORTS:
The results of any tests required to be filed by grantee with the FCC shall upon request of city also be filed with city or its designee within ten (10) days of the conduct of such tests. (Ord. 827, 8-5-2002, eff. 8-26-2002)