(a) Storm Sewer System Required. A system for disposal of storm drainage shall be required in all subdivisions.
(b) Public Connection. Where connection to existing public storm drainage facilities is available, as determined by the Municipality, the storm drainage system of a subdivision shall be connected thereto.
(c) Alternate. Where connection to a public storm drainage system is not possible, as determined by the Municipality, the subdivider shall be required to make such alternate provisions for storm drainage disposal as are approved by the Municipal or County agency having jurisdiction.
(d) Individual Lot Drainage. Each lot in any subdivision shall be so graded as to permit the flow of storm drainage from the entire lot to a public system for disposal.
(e) Materials and Specifications. The design and construction of storm drainage disposal facilities as required by this section shall be in conformity with current specifications on file in the office of the Clerk- Treasurer.
(Ord. 71-14. Passed 11-9-71.)