3.4.20. ZONING PERMIT.
   A.   Purpose. A zoning permit is required for development that does not require an engineered site plan. The use made of property may not be substantially changed, and substantial clearing, grading, or excavation may not be commenced, and buildings or other substantial structures may not be constructed, erected, moved, or substantially altered except in accordance with and pursuant to a Zoning permit. Zoning permits shall be reviewed for compliance with the provisions defined in this UDO. Zoning permits are required for:
      1.   Fences;
      2.   Driveways and driveway extensions;
      3.   Accessory Structures 12x12 feet and under including swimming pools;
      4.   Home occupations;
      5.   Family care homes;
      6.   Group homes;
      7.   Intermediate homes;
      8.   Childcare homes;
      9.   Change of Use/Occupancy for businesses;
      10.   Additions to structures including residential, commercial, and industrial;
   B.   Application. A completed application form for a zoning permit shall be submitted to the Planning and Development Department. The Director or their designee will review and issue a decision on application consistent with the UDO.
   C.   Approval Process. Approval shall be contingent upon the below:
      1.   Proposed use being permitted in the zoning district;
      2.   Application and any required documents must be complete;
      3.   Application must comply with all standards and requirements of the UDO;
      4.   If the application meets all standards of the UDO, the application shall be approved by the Director.
   D.   Appeal. If an applicant disagrees with the decision rendered for a zoning permit, the applicant may submit an appeal in accordance with Section 3.4.11: Appeals.
   E.   Effect. Approval of a zoning permit shall authorize an applicant to commence construction, provided all requirements of this UDO and other applicable rules and regulations are met.
   F.   Expiration. A zoning permit shall expire and become void if development does not commence within 180 days of permit issuance.
(Am. Ord. O-2022-70, passed 11-8-22)