6-3-4: EASEMENTS:
   A.   Utility distribution of transmission installations serving the subdivision and, when required, storm water drainage ways, shall be located in easements as designated on the subdivision plat of record. Such easements shall be located along the rear lot lines or side lot lines at locations of extensions of utility installation between blocks or continuity of drainage ways. They shall occupy not less than the rear ten feet (10') of lot depth or ten feet (10') of lot width adjoining the applicable side lot line, or may be of a greater width if recommended by the Village Engineer and approved by the Village Board. Additional easements at other locations may be recommended for specific conditions by the Village Engineer and required by the Village Board.
   B.   Where a subdivision is traversed by a natural drainage way, channel or stream, there shall be provided a drainage easement conforming substantially with the areas bordering such watercourse that are subject to flooding, unless said watercourse is improved by deepening or dredging to provide the same cross-sectional area or floor capacity, in which case the drainage easement may be narrowed to accommodate the improved watercourse. The boundaries of such areas subject to flooding shall be as designated by the Village Engineer. (Ord., 5-15-1974)