4-19-4-2: PRETREATMENT FACILITIES:
Any pretreatment facility(s) necessary for compliance shall be provided and shall be properly maintained continuously in satisfactory and effective operation by the user at the user's sole cost and expense. Detailed plans and specifications describing such facilities and operating procedures shall be submitted to the Coordinator for review and approval prior to the construction and operation of such facilities. The review of such plans and specifications shall in no way relieve the User from the responsibility of modifying such facilities as necessary to comply with the provisions of this chapter.
All Users are required to comply with IEPA permitting requirements. A User shall file an IEPA application for a construction-operating permit prior to construction or significant modification of a Pretreatment system that has been signed-off by the Village and obtain either a permit from the IEPA or a letter indicating no permit is needed prior to the village connection and/or wastewater discharge permit(s) being issued. No sources of non-residential wastewater shall be discharged to the POTW until all permitting requirements have been satisfied. All pretreatment facilities designated by the Coordinator shall be under the control and direction of an IEPA-certified wastewater operator even if the User is not issued an IEPA operating permit.
Any subsequent proposed modification, alteration, or change to the pretreatment facilities or method of operation shall be submitted to the village and IEPA for review and approval prior to the user's initiation of the changes. Users shall obtain all necessary additional construction-operating permits from IEPA and the Village for the changes prior to making said modification, alteration, or change. (Ord. 2020-33, 11-24-2020)