All excavations in the Village streets, alleys and public ways, in addition to the requirement for permit as provided in Section 905.02 and other requirements mentioned therein, be completed as follows:
(a) All excavated material shall be removed from the streets, alleys and public ways, and not used as backfill material, but shall be disposed of by the contractor or other person excavating in the streets, alleys or public ways, as he shall so desire, off of the public ways.
(b) All excavated areas shall be backfilled with sand, gravel or other granular substances, and rolled, tamped or compacted into position. Surface pavements shall be replaced as specified in Section 905.03. All work performed under this chapter shall meet with the approval of the Street Superintendent.
(Ord. 65-921. Passed 5-24-65.)