(a) Where a lot or parcel of land is considered a through lot, the required minimum front yard setback shall be provided on both streets.
(b) The remaining lot lines not abutting a public road right-of-way shall be considered as side yards and shall have the required minimum side yard setback provided for each side lot line.
Figure 1183-C
Through Lot
(Ord. 99-1966. Passed 5-4-99.)