§ 52.15 DEFINITIONS.
   For the purpose of this subchapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning.
   BIOCHEMICAL OXYGEN DEMAND (BOD). The quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedure in five days at 20°C, expressed in milligrams per liter.
   BUILDING DRAIN. The part of the lowest horizontal piping of a drainage system which receives the discharge from soil, waste, and other drainage pipes inside the walls of the building and conveys it to the building sewer, beginning five feet (one and one-half meters) outside the inner face of the building wall.
   BUILDING SEWER. The extension from the building drain to the public sewer or other place of disposal, also called HOUSE CONNECTION.
   CITY ENGINEER. The registered engineer for the city or his or her authorized deputy, assistant, agent, or representative.
   EASEMENT. An acquired legal right for the specific use of land owned by others.
   FLOATABLE OIL. Oil, fat, or grease in a physical state such that it will separate by gravity from wastewater by treatment in an approved pretreatment facility. Wastewater shall be considered free of floatable fat if it is properly retreated and the wastewater does not interfere with the collection system.
   GARBAGE. The animal and vegetable waste resulting from the handling, preparation, cooking, and serving of foods.
(Prior Code, § 13.89.010) (Ord. 457, passed - -1979; Ord. 607, passed - -1994)