Upon abandonment, the owner shall physically remove the Solar Energy System within
sixty (60) days from the date of abandonment. "Physically remove" shall include, but not be limited to:
(a) Removal of the Solar Energy System and related above grade structures.
(b) Restoration of the location of the Solar Energy System to its prior condition.
(Ord. 830-08-22. Passed 8-24-22.)