(a) Solar Energy Systems shall be designed, erected, installed, operated, and maintained in accordance with the provisions set forth in this Chapter.
(b) A Building Permit, Zoning Permit and Electrical Permit shall be required prior to the erection, installation, connection, or operation of any Solar Energy System.
(c) Like-kind replacements, minor repairs or maintenance of lawfully existing Solar Energy Systems not involving structural changes may be undertaken without first obtaining a permit.
(Ord. 830-08-22. Passed 8-24-22.)