921.03 TAP FEES.
   There shall be charged for each new meter installation within the corporation limits of the Village, a fee of four hundred fifty dollars ($450.00) plus the cost of the meter and all of the labor, materials and supplies necessary for such installation; for each meter installation outside the corporation limits of the Village, a fee of nine hundred dollars ($900.00), plus the cost of the meter and all labor, materials and supplies necessary for such installation. All meters and materials used in any installation, whether inside or outside of the Village limits and regardless of the size of the meter, shall be and remain the property of the Village. The appropriate tap-in fee and meter cost shall be paid with the application for service, and the cost of labor, materials and supplies shall be due upon billing. As used in this section, “new meter” shall mean a newly installed meter and not a newly manufactured meter. All meters shall be installed on public right of way, except where specifically authorized in advance by the Village Administrator.
(Ord. 073-7-97. Passed 7-8-97.)