In the General Flood Plain District, applicants shall provide the information required in § 153.071 to determine the 100-year flood elevation, the Floodway and Flood Fringe District boundaries and the regulatory flood protection elevation for the subdivision site.
(Ord. 397, passed 1-17-13)