§ 152.36 FUTURE USES; PERMIT REQUIRED.
   (A)   Except as specifically provided in division (B) below, no material change shall be made in the use of land and no structure or tree shall be erected, altered, planted, or otherwise established in any zone hereby created unless a permit therefor shall have been applied for and granted by the Zoning Administrator, hereinafter provided for. Each application for a permit shall indicate the purpose for which the permit is desired, with sufficient particularity to permit it to conform to the regulations herein prescribed. If the determination is in the affirmative, the permit shall be granted.
   (B)   (1)   However, a permit for a tree or structure of less than 75 feet of vertical height above the ground shall not be required in the horizontal and conical zones or in any approach and transitional zones beyond a horizontal distance of 4,200 feet from each end of the runway except when that tree or structure, because of terrain, land contour, or topographic features, would extend above the height limit prescribed for the respective zone.
      (2)   Nothing contained in this foregoing exception shall be construed as permitting or intending to permit any construction, alteration, or growth of any structure or tree in excess of any of the height limitations established by this chapter as set forth in §§ 152.20 and 152.21.
(Ord. passed 8-6-75) Penalty, see § 10.99