(A) The tap on fee for a sewer connection shall be based on the water meter size serving the connection as follows:
Water Meter Size
|
Capacity Factor
|
Tap on Fee
|
Water Meter Size
|
Capacity Factor
|
Tap on Fee
|
5/8 inch | .75 | $ 1,500 |
1 inch | 1.33 | 1,995 |
1 1/2 inch | 2.00 | 3,000 |
2 inch | 2.66 | 3,990 |
3 inch | 4.00 | 6,000 |
4 inch | 5.33 | 7,995 |
6 inch | 8.00 | 12,000 |
8 inch | 10.66 | 15,990 |
(B) The fees are in addition to the city's fees for water service connection and do not include the cost of materials, labor, and construction of the sewer connection. The cost of the labor and materials and the actual construction of the sewer connection is the responsibility of the property owner, and is subject to the approval of the city.