Section 624 - As-Built Drawings
As-Built Drawings will be provided by the Applicant as follows:
   A.   Within fifteen (15) days of completion of the sanitary sewer installation, a set of progress drawings showing all sewer laterals located by depth and measurement to the two (2) lot corners fronting on the road will be provided to the Public Works Director. The Public Works Director will not issue any sewer hook-up permits until these prints are received.
   B.   Within thirty (30) working days of completion of construction of all required improvements, a mylar (not sepia mylar) will be provided to the Public Works Director. Additionally, a complete set of As-Built Drawings, showing all changes made to the original construction plans, will be provided to the Public Works Director and Town Planner. The As-Built Drawings must be marked "As-Built Drawing" and must be certified by a registered professional engineer or registered land surveyor.