The Planning Board may require that surface and sub-surface storm drainage pipes and facilities be installed and connected to dry wells or watercourses, retention, detention or holding ponds, or an existing public storm drainage system. Any connection to an existing public storm drainage system shall be allowed only with the approval of the Planning Board.