Rock and ledge excavations shall include all hard rock which can be removed by drilling or splitting by hand, by mechanical means or by blasting, and shall be removed to a depth of at least twelve (12) inches below sub-grade, and, where applicable, ledge side slopes shall be at least four (4) feet vertical to one (1) foot horizontal.