7-2-4: SEWER CONNECTION REQUIREMENTS, CHARGES AND CONSTRUCTION:
   A.   Sewer Line Connection; Construction Requirements And Inspection Required: Upon payment of a connection fee and receipt of a proper permit from the city, it shall be the duty of the owner or his representative to make all connections with and from the city sewer system and to provide all materials and labor required for the same. All materials and construction shall be furnished and installed in accordance with the "Idaho Standards For Public Works Construction", plumbing code and city of Middleton supplemental standards. All work shall be inspected by the city and shall, together with all fixtures thereof, be the property of the city upon city written acceptance.
   B.   Disapproved Materials Or Workmanship: The city may reject any materials or workmanship at its discretion and upon rejection the rejected material shall be removed and replaced with approved material. Disapproved workmanship shall cause the removal and replacement of all materials involved, including appurtenances such as excavations, backfilling and other work items, at the sole cost of the applicant or property owner. (Ord. 553, 3-18-2015)