7-2-2: APPLICATION FOR PERMIT:
   A.   Application: Prior to the construction, modification or repair of any sewer service line, the owner shall apply for permission to connect and pay the connection fee established by the City Council. All applications for permits must be made in writing upon the proper blanks for that purpose, and signed by the owner or his authorized agent, and when it is required by the City, they shall be accompanied by a plan showing the whole course of the service which is to be constructed, together with the size of the same, the location of all branches, depth below the floor of the building, and such other information as may be required for the proper direction of the work.
   B.   Denial Of Application: The public works department may deny an application when the capacity of the city's sewer system might be impaired or there are slope and/or other design issues based upon reasonable engineering standards and practices regarding such installation as it pertains to maintenance, materials used, diameter of the line, the providing of cleanouts, and the relationship of the buildings to the sewer system. (Ord. 553, 3-18-2015)