No holder of a conditional zoning certificate shall, without the express approval of the Planning Commission, be authorized to locate gas lines or other structures or appurtenances associated with oil or gas wells within any public property. In the event that an easement is granted to any such conditional zoning certificate holder, the fee for such utilization of such property shall be not less than $.50 per linear foot. In addition thereto, any such permission shall contain a requirement that a bond shall be posted in the amount established by the Planning Commission for restoration of the property where the line is located; a requirement that the holder shall landscape any metering, processing, or other equipment areas associated with the gas line and/or wells; a requirement of a minimum line depth of 40 inches; and a requirement that the applicant post with the Village for the duration of the line's existence in the public right-of-way, evidence of insurance, satisfactory to the Village, for property damage and personal injury, which insurance shall, in no event, be less than $100,000 per individual, $300,000 per occurrence, and contain $50,000 worth of property coverage, which insurance will remain in effect or the use-life of the pipeline. If any gas/oil lines interfere with other public utilities servicing Village rights of way, these gas/oil lines shall be relocated at the owner's expense.
(Ord. 84-127. Passed 2-4-85; Ord. 13-150. Passed 1-9-14.)