(a) Upon receipt of the application by the Village Engineer as set forth in Section 921.02, the Engineer shall contact the applicant in writing and advise that the proposed location for the placement of equipment or facilities, the suggested method of work and remedial is satisfactory or unsatisfactory as the case may be and if it is unsatisfactory, outline a satisfactory location or method; that the time allotted is sufficient or insufficient and if it is insufficient, advise a sufficient time; the estimated cost of the involvement of the Municipal roadway, water system and/or sewer system and the amount of the required bond as provided by Section 921.05.
(b) Upon payment of all applicable fees, submission of evidence of insurance, posting of the bond, and upon approval of the Village Engineer, the Village Administrator shall issue a permit for the work.
(Ord. 07-159. Passed 12-31-07.)
(Ord. 07-159. Passed 12-31-07.)