(A) The director may require any IU to construct, at the IU's expense, monitoring facilities to allow inspection, sampling and flow measurement of the waste discharged, together with sampling or metering equipment to be provided, installed and operated at the IU's expense. Such inspection chamber or control manhole shall be situated on the IU's premises and shall be constructed and operated to permit accurate sampling and flow measurements of all wastes discharged. Where conditions do not permit measurement of all discharges from one industrial facility at a single control manhole, multiple control manholes shall be provided. The control manhole shall be located so as to permit access by county representatives, provide sufficient space for storage of samples and equipment and allow for accurate sampling and flow measurement. Such facilities shall be located so that samples may be taken safely and easily and shall not be obstructed by landscaping, parked vehicles or other activity of the IU.
(B) Whether constructed on public or private property, the monitoring facilities shall be constructed in accordance with the director's requirements and all applicable county construction standards and specifications. When, in the judgment of the director, an existing IU requires a monitoring facility, the IU will be so notified in writing. Construction must be completed within 90 calendar days following written notification, unless a time extension is otherwise granted by the director.
(Ord. 679, passed 9-26-2017)