§ 54.51 ADDITIONAL PRETREATMENT MEASURES.
   (A)   Whenever deemed necessary, the director may require IUs to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate domestic wastewater wastestreams from industrial wastestreams, and such other conditions as may be necessary to protect the WWF and determine the IU's compliance with the requirements of this chapter.
   (B)   The director may require any person discharging into the WWF to install and maintain, on their property and at their expense, a suitable storage and flow-control facility to ensure equalization of flow. An individual wastewater discharge permit may be issued solely for flow equalization.
(Ord. 679, passed 9-26-2017)