§ 92.004 TWO-PHASE DESIGN/BUILD SELECTION PROCEDURE.
   The Board authorizes the use of a two-phase design/build selection procedure, conforming to the Act, for Rock Island Bridge 275.
(Res. MET 19-02, passed 2-20-2019)