§ 50.010 DBE GOALS.
   (A)   The Commuter Rail Division is required by the Department of Transportation to establish percentage goals for DBE participation (49 C.F.R. part 26). Such goals, where practical and related to the availability of minority and female firms in desired areas of expertise, provide a benchmark for achievement of the DBE policy/program within a specified time frame.
   (B)   (1)   (a)   In order to measure the success of the overall affirmative action program for DBEs, two types of goals have been developed against which progress will be measured:
            1.   Overall goals; and
            2.   Contract specific goals.
         (b)   Separate overall goals shall be set for firms owned and controlled by minorities and firms owned and controlled by women.
      (2)   (a)   Overall goals.
            1.   The CRD has established overall year. DBE goals for its contracting activities for the current fiscal year. Those goals, stated in percentages of dollar amounts of contracts awarded, are:
               a.   Fifteen percent of contract dollar amounts for minority owned and controlled firms; and
               b.   Five percent of contract dollar amounts for female owned and controlled firms.
            2.   These goals will be reviewed and revised, if necessary, on an annual basis.
            3.   The following factors were considered in establishing the foregoing overall goals:
               a.   Projection of the number and types of contracts to be awarded by the Commuter Rail Division.
                  i.   The Division of Grant Development estimates the fiscal year 1984 unobligated prior approved capital awards of $71,000,000. The following pages are the approved grants and their projected MBE/WBE participation percentages.
                  ii.   The Division of Grant Development estimates the fiscal year 1984 previously approved operating awards of almost $5,000,000.
                  iii.   The Division of Grant Development estimates pending grant awards in the amount of $79,564,000 of which $15,000,000 is for the acquisition of Milwaukee Road assets.
REGIONAL TRANSPORTATION AUTHORITY
Minority Business Enterprise Department
1984 FISCAL YEAR GOALS BASED UPON PROJECTED DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION ON ANTICIPATED FEDERALLY ASSISTED CONTRACTS
SUMMARY BY GRANT AND BY ACTIVITY
Grant Numbers
Purchases Only
Engineering Only
Engineering MRE (15%)
Engineering MBE (5%)
Construction Only
Construction MBE (15%)
REGIONAL TRANSPORTATION AUTHORITY
Minority Business Enterprise Department
1984 FISCAL YEAR GOALS BASED UPON PROJECTED DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION ON ANTICIPATED FEDERALLY ASSISTED CONTRACTS
SUMMARY BY GRANT AND BY ACTIVITY
Grant Numbers
Purchases Only
Engineering Only
Engineering MRE (15%)
Engineering MBE (5%)
Construction Only
Construction MBE (15%)
11-03-0065
$1,682,659
$ -0-
$ -0-
$ -0-
$1,280,887
$192,133
11-03-0076
$50,000
$1,224,949
$183,742
$61,248
$8,666,204
$1,299,931
11-03-0085
$1,142,500
$ -0-
$ -0-
$ -0-
$ -0-
$ -0-
11-03-0089
$5,059,104
$214,995
$32,249
$10,750
$1,015,000
$152,250
11-03-0093
$2,694,209
$2,983,054
$447,458
$149,153
$2,910,000
$436,500
11-03-0101
$3,522,000
$1,336,000
$200,400
$66,800
$87,000
$13,050
11-05-0016
$2,232,167
$167,026
$25,054
$8,351
$2,493,000
$373,950
11-05-0034
$1,326,051
$1,012,884
$151,933
$50,644
$149,100
$22,365
11-90-0008
$15,720,760
$1,005,000
$150,750
$50,250
$5,819,350
$872,903
GRAND TOTALS
$33,429,450
$8,418,908
$1,262,836
$420,946
$22,420,541
$3,363,082
REGIONAL TRANSPORTATION AUTHORITY
Minority Business Enterprise Department
1984 FISCAL YEAR GOALS BASED UPON PROJECTED DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION ON ANTICIPATED FEDERALLY ASSISTED CONTRACTS
Project Element
Description of Contract
Activity
Contract $ Amount
Projected MBE %
MBE $ Value
Projected WBE %
WBE $ Value
REGIONAL TRANSPORTATION AUTHORITY
Minority Business Enterprise Department
1984 FISCAL YEAR GOALS BASED UPON PROJECTED DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION ON ANTICIPATED FEDERALLY ASSISTED CONTRACTS
Project Element
Description of Contract
Activity
Contract $ Amount
Projected MBE %
MBE $ Value
Projected WBE %
WBE $ Value
GRANT 11-03-0065
A50205
RN - Clyde Street Station rehabilitation
RN - Clyde Street Station rehabilitation
Purchases
Construction
$36,852
$235,000
A50208
MR - Commuter car rehabilitation
Purchases
$21,547
A50216
LCG Tie stations/circuit breakers
Purchases
$91,009
A50221
RI - Prairie/Gresham crossovers
Purchases
$286,520
A50222
RI - Reverse signal track 3
Purchases
$603,240
A50224
RI - Rehab 22 station platforms
Purchases
$65,214
A50230
RI - Joliet Coach Yard
RI - Joliet Coach Yard
Purchases
Construction
$433,172
$1,045,887
A50213
C3H7 - Rehab 5 locomotives
Purchases
$145,105
 
 
GRAND TOTAL
$2,963,546
 
 
Engineering Only
$ -0-
15%
$ -0-
5%
$ -0-
 
 
Purchases Only
$1,682,659
N/A
N/A
 
 
Construction Only
$1,280,887
15%
$192,133
N/A
GRANT IL-03-0076/CAP-78-117-FED
A90693
CNW - DesPlaines bus lane
Construction
$79,614
A90604
Bus - Elgin - New bus/rail facility
Engineering
Construction
$137,236
$499,504
A90609
CNW - Waukegan - Bus/Rail Facility
Engineering
$105,452
A90618
CNW - Chicago Passenger Terminal
Engineering
Construction
$86,268
$1,180,000
A90622
HN - Western Avenue Station
Construction
$109,000
A90624
HR - 14 stations
Construction
$77,087
A90625
HR Grayslake/Ingleside
Construction
$75,000
A90627
ICG - Randolph Street Station Rehabilitation
Purchases
Construction
$42,600
$72,400
A90628
ICG - VanBuren Street rehabilitation
Construction
$45,000
A90629
ICG - Roosevelt Road rehabilitation
Construction
$45,000
A90632
ICG - 7 Station rehabilitation
Engineering
Construction
$413,133
$275,000
A90633
ICG Richton Park
Construction
$500,000
A90635
C&NW - West Chicago
Engineering
Construction
$52,100
$490,000
A90643
C&NW - North Chicago
Engineering
$68,268
A90644
C&NW - Gary
Engineering
$117,944
A90645
RI - Vermont Street Station
Engineering
$36,740
A90646
ICG - Flossmoor
Engineering
$121,188
A90652
N&W - Lansing
Engineering
$16,620
A90653
LUS - Standby - Power
Engineering
Construction
$40,000
$600,000
A90655
LUS - Additional Escalator
Purchases
Engineering
Construction
$50,000
$30,000
$350,000
A90656
Gen. “Special Package”
Construction
$2,345,999
A90657
Gen. Step User Improvements
Construction
$1,790,000
A90659
RI - 99th Street Station
Construction
$90,000
 
 
TOTAL
$9,941,153
 
 
Engineering Only
$1,224,949
15%
$483,742
5%
$61,248
 
 
Construction Only
$8,666,204
15%
$1,299,931
 
 
Purchases Only
$50,000
N/A
N/A
N/A
GRANT IL-03-0085
C51002
IRA Glazing
Purchases
$275,757
C51011
Iles South Chicago Branch - ICG
Purchases
$130,441
C51015
Iles - Blue Island/Joliet NIRCRI
Purchases
$174,366
C51016
Rehabilitate bridges and Polk Street interlockers
Purchases
$177,890
C51017
Jackson Street station
Purchases
$141,046
C51018
Clinton Street pollution control
Purchases
$108,000
C51019
Chicago shop pollution control
Purchases
$135,000
 
 
GRANT TOTAL
$1,142,500
 
 
Purchases Only
$1,142,500
N/A
N/A
 
 
Engineering Only
$ -0-
15%
$ -0-
$ -0-
 
 
Construction Only
$ -0-
15%
$ -0-
$ -0-
GRANT IL-03-0089/CAP-81-173-FED
C21051
Replace semaphore signals
Purchases
$14,938
C21052
Replace cable
Purchases
$68,765
C21053
Replace base radio and phone
Purchases
Construction
$110,816
$18,000
C21054
Replace Mayfair interlocker
Purchases
$750,000
C21055
Install yard pollution control
Engineering
Construction
$55,000
$439,000
C21056
Install pollution control
Engineering
$70,000
C21057
Purchase turnouts and switches
Purchases
$35,849
C21058
Replace switch heaters
Purchases
$44,659
C21059
Purchase equipment
Purchases
$524,591
C21060
Standby Power Cal. Ave. Yard #2
Purchases
$90,000
C21061
Ventilate Randolph vault
Construction
$10,000
C21063
Signal batteries and rectifiers
Purchases
$53,619
C21064
Yard security lights
Purchases
$12,000
C21065
Renew Randolph Street interlockers
Purchases
$1,200,000
C21066
Rehabilitate Harrison to Taylor
Purchases
$2,000,000
C21067
Lake Street switch machine
Purchases
Construction
$10,867
$32,000
C21068
Clinton Street switch heaters
Purchases
Construction
$127,000
$16,000
C21069
Renew HI interlockers
Engineering
$15,000
C21070
Replace switch heaters
Purchases
$16,000
C21072
North and South End DC crew facility
Engineering
Construction
$74,995
$500,000
 
 
GRAND TOTAL
$6,289,099
 
 
Engineering Only
$214,995
15%
$32,249
5%
$10,750
 
 
Purchases Only
$5,059,104
N/A
N/A
N/A
N/A
 
 
Construction Only
$1,015,000
15%
$152,250
N/A
N/A
GRANT IL-03-0093/CAP-82-194-FED
D41202
CNW - 50,000 Lies/250 CI ballast
Purchases
$56,879
D41206
CNW - Improve ROW fencing
Purchases
$51,469
D41207
CNW - Consol. Clinton/Lake interlock
Engineering
$174,650
D41209
HR - Lies/ballast - A2/A5
Purchases
$555,507
D41210
HR - Lies/ballast - Canal/A2
Purchases
$300,513
D41211
ICG - So. Chicago Bridge - rehabilitate RIM/Crossing
Purchases
$157,983
D41212
ICG - Rail grinding
Construction
$210,000
D41213
MR - Rail grinding
Construction
$115,000
D41215
RI - Consolidate/rehabilitate 16th and root interlocker
Engineering
Construction
$275,000
$250,000
D41216
RI - Rehabilitate Bridges/walls/culverts
Purchases
Engineering
Construction
$79,645
$80,000
$500,000
D44248
RI - Givens Station rehabilitation
Engineering
$14,000
D44224
CN&W - Rehabilitate California Avenue Yard
Engineering
$125,000
D44225
CN&W - Rehabilitate M19A maintenance yard
Engineering
$125,000
D44228
CN&W - Standby power
Purchases
$242,000
D44229
RN - Rehabilitate 14th Street yard
Construction
$250,000
D44231
RI - Rehabilitate 47th Street yard
Purchases
Construction
$150,000
$850,000
 
 
GRAND TOTAL
$8,587,263
 
 
Engineering Only
$2,983,054
15%
$447,458
5%
$149,151
 
 
Purchases Only
$2,694,209
N/A
N/A
 
 
Construction Only
$2,910,000
15%
$436,500
N/A
D44230
ICG - Sprinkler system - 16th Street yard
Purchases
Construction
$60,000
$35,000
D44231
RI - Rehabilitate 47th Street yard
Engineering
Construction
$750,000
$700,000
D44233
CNW - Clybourn Station rehabilitation
Engineering
$62,000
D44234
CNW - Rogers Park Station rehabilitation
Engineering
$13,000
D44235
CNW - Indian Hill Station rehabilitation
Engineering
$15,918
D44236
CNW - Irving Park Station rehabilitation
Engineering
$21,000
D44237
CNW - Norwood Park Station rehabilitation
Engineering
$26,000
D44238
CNW - Cumberland Station rehabilitation
Engineering
$19,000
D442
CNW - Melrose Park Station rehabilitation
Engineering
$32,000
D44242
HR - Elgin Station rehabilitation
Engineering
$14,000
D44244
HR - Mars Station rehabilitation
Engineering
$33,000
D4424
RI - Gresham Station rehabilitation
Engineering
$23,000
D44217
CNW - Replace semaphore signals
Purchases
$103,778
D44218
CNW - Replace signal cable
Purchases
$138,500
D44219
ICG - Install standby power - stations
Purchases
$25,000
D44220
ICG - Replace messenger wire
Purchases
$192,927
D44221
ICG - Replace switch heaters
Purchases
$24,000
D44222
ICG - Replace impedance bonds
Purchases
$16,559
D44223
ICG - Replace aerial cable
Purchases
$18,341
D44224
CNW - Rehabilitate California Avenue Yard
Engineering
$304,148
D44225
CNW - Rehabilitate M194 maintenance yard
Engineering
$179,368
D44226
HR - Rehabilitate Western Avenue Yard
Purchases
Engineering
$249,140
$697,000
D44227
CNW - Standby power
Purchases
$13,000
D44228
HR - Rehabilitate 14th Street yard
Purchases
$258,968
GRANT IL-05-0034
D84327
Maintenance equipment Joliet UZA
Purchases
$25,000
 
 
Grand Total
$2,488,035
 
 
Purchases Only
$1,326,051
N/A
N/A
N/A
N/A
 
 
Engineering Only
$1,012,884
15%
$151,933
5%
$50,644
 
 
Construction Only
$149,100
15%
$22,365
N/A
GRANT IL-03-0101
F44404
50,000 Ties/ballast/grade crossings
Purchases
Engineering
$1,650,000
$100,000
F44408
Noble Street interlocker renewal
Purchases
$175,000
F44410
Western Avenue interlocker renewed
Purchases
$175,000
F44412
Bridge renewal program
Engineering
$160,000
F44413
Gresham interlocker renewal
Engineering
$160,000
F44426
Bridge renewal program
Engineering
$290,000
F44430
Adams Street bridge modification
Engineering
$75,000
F44434
Battery and rectifier replacement
Purchases
$60,000
F44437
Semaphore signal replacement
Purchases
$50,000
F44438
Radio dispatcher signal modes
Purchases
$30,000
F44446
Upgrade PC switch machines
Purchases
$29,000
F44447
Messenger wire - Phase IV
Purchases
$390,000
F44449
Replace aerial cable
Purchases
$65,000
E44452
Yard/shop rehabilitate 6 locations
Engineering
$250,000
E44456
CCTV Catenary inspection equipment
Purchases
$11,000
E44459
Vehicles, equipment and shop improvements
Purchases
$80,000
E44460
Communication test equipment
Purchases
$79,000
E44461
New storage and fueling facility
Engineering
$40,000
E44462
Maintenance and support equipment
Purchases
$700,000
E44464
Extend Adams Street kiosk
Engineering
$28,000
E44465
Main Street (Evanston) Station rehabilitation
Engineering
$120,000
E44466
Ravinia Station rehabilitation
Engineering
$47,000
E44467
Lombard Station rehabilitation
Engineering
$28,000
E44468
Berkeley Station rehabilitation
Purchases
$28,000
E44469
103rd Street (Washington Heights) Station rehabilitation
Construction
$87,000
E44470
Northbound - New station
Engineering
$38,000
 
 
GRAND TOTAL
$4,945,000
 
 
Engineering Only
$1,336,000
15%
$200,400
5%
$66,800
 
 
Purchases Only
$3,522,000
N/A
N/A
N/A
N/A
 
 
Construction Only
$87,00
15%
$13,050
N/A
N/A
GRANT IL-90-0008
E21481
Buses
Purchases
$610,000
E21482
Rolling stock
Purchases
$130,000
E21483
Grade crossing protection
Purchases
$80,000
E21484
Rail rehabilitation
Purchases
$2,000,000
E21485
?? System
Purchases
$350,000
E21488
Waste trash drainage
Purchases
$75,000
 
 
GRAND TOTAL
$22,545,110
 
 
Engineering
$1,005,000
15%
$150,750
5%
$50,250
 
 
Purchases
$15,720,760
N/A
N/A
 
 
Construction
$5,819,350
15%
$872,903
N/A
E20230
Joliet coach yard
Construction
$1,000,000
???
Elgin bus and rail facility
Construction
$510,650
???
Fairview Avenue platform
Construction
$74,000
???
Richton Park Station
Construction
$701,000
???
Davis Street Station
Construction
$924,000
???
North Chicago Station
Construction
$379,000
???
Oak Lawn Station
Construction
$415,000
???
Joliet garage facility
Construction
$460,700
???
Lies and ballast
Purchases
$100,000
???
???? and clean ballast
Purchases
$30,000
???
Rehabilitate bridges, walls and culverts
Construction
$855,000
???
???
Purchases
$973,000
???
????
Purchases
$2,000,000
???
??? interlocker renewal
Engineering
$200,000
F24428
Canal Street road crossing
Purchases
$115,000
F24429
Rail ??
Purchases
$200,000
???
Centralized train control machine
Purchases
$1,320,000
???
Upgrade impedance bonds
Purchases
$77,000
???
Renew power supervisory system
Purchases
$270,000
???
Replace Signal Transformers
Purchases
$250,000
???
Improve 15th Street and Matteson Yard
Engineering
$675,000
???
Purchase and Install Computer Equipment
Purchases
Construction
$2,300,000
$500,000
???
Renovate Aurora Garage Facility
Engineering
$130,000
???
Improve R.O.W. North Line
Purchases
$310,000
???
Rehab. R.O.W. Blue Island Branch
Purchases
$300,000
???
Right-of-way fencing Beverly Branch
Purchases
$80,000
???
Rolling stock
Purchases
$4,150,760
 
               b.   The capabilities of DBEs to comply with CRD’s purchasing standards. Since the inception of the DBE office of the RTA, an education program was taking place to make potential DBE suppliers aware of CRD’s standards. A number of minority firms have benefitted over the past several years from this activity and have become frequent suppliers of goods and services. This program will continue through the Commuter Rail Divisions’ DBE staff efforts and affirmative action on part of the buyers.
         (b)   Contract specific goals.
            1.   Construction.
               a.   A program has been developed which ensures that when construction contracts are awarded, the prime contractor must meet the goals set forth in the solicitation for minority owned construction firms. Bidders or proposers for construction projects must meet or exceed the level of DBE participation required, or satisfactorily demonstrate that the goal could not be met despite their best efforts.
               b.   The Board of Directors of the Commuter Rail Division shall be the final determiner of whether or not acceptable good faith efforts have been made by the prime contractor. Factors to be considered shall include, but are not limited to, nature of the project and degree of specialization of the work to be performed, the availability of bona fide DBE firms with expertise in the specific trades included within the scope of the contract, geographic area where the project work will be performed and the DBE goal achievement of other public bodies with similar programs in the locality.
               c.   i.   The prime contractor is required to make every effort to locate eligible minority subcontractors. Pro forma efforts that do not accomplish goal attainment are not acceptable.
                  ii.   Examples of good faith efforts to be demonstrated and documented by the prime contractor include the following:
                     A.   Written notice to a reasonable number of minority firms with expertise in the appropriate trade or profession soliciting their interest in a phase of the contract (and documenting that contact);
                     B.   Providing interested minority firms with adequate information about the plans, specifications and requirements of the contract (and maintaining record of such contact);
                     C.   Negotiating in good faith with interested MBEs, not rejecting DBEs as unqualified without sound reasons based on a thorough investigation of their capabilities (and be able to document any “unqualified”);
                     D.   Soliciting the aid of CEDCO Contractors Division, or other such Minority Construction Trade Associations, in locating competent minority contractors and furnish records of such solicitation upon request;
                     E.   Assisting interested and qualified DBEs in obtaining bonding and/or insurance required in connection with the contract, if needed; and
                     F.   Contacting the CRD’s DBE office at 312-836-4205 to obtain a listing of minority contractors, if needed.
               d.   A record of all activities to demonstrate good faith efforts should be kept, and made available to the CRD upon request.
               e.   The CRD sends a copy of each construction bid specification to the Chicago Economic Development Corporation (“CEDCO”), 1711 East 71st Street, Chicago, Illinois 60649 free of its usual charge of $25 through $50. Any interested minority contractor can study the plan at the CEDCO office. If the prime contracting firm cannot locate minority firms, it is obliged to contact CEDCO for referrals, as a demonstration of good faith efforts. Minority contractors seeking a subcontracting arrangement can also call the DBE office of the CRD to find the names of construction firms who have purchased the bid specifications.
               f.   Of course, DBE firms may bid as prime contractors or enter into joint venture arrangements with other firms for the performance of the contract.
            2.   Architectural and engineering contracts. A program has been developed which ensures that when architectural and engineering contracts are awarded, the prime consultant must meet the goals set forth in the solicitation for minority and female owned consulting firms. Bidders or proposers for architectural and engineering projects must meet or exceed the level of minority and female business participation required, or demonstrate to CRD’s satisfaction that the goal could not be met despite their best efforts as described in the preceding section.
            3.   Manufacturers of transit vehicles. The MBE requirement for manufacturers of transit vehicles is the responsibility of UMTA. All such firms must be approved by UMTA on the basis of their DBE goal setting. Manufacturers of transit vehicles must certify to CRD that they have an UMTA approved goal before contracting can be effected.
            4.   Other awards with subcontracting possibilities. As part of its responsibilities, the DBE office is required to consider subcontracting possibilities in all procurements and establish goals for DBE participation in appropriate cases. Such goals, once established, shall be an element of responsiveness to the bid document.
(Ord. CRB 84-42, passed 9-14-1984)