A. Plan Review Process: The Meadow Town Council will review and recommend all applications for development and will determine if all requirements have been met. (Ord. 2019-3, 9-18-2018)
B. Application: An applicant for new development shall contact the Town Council to discuss the scope and purpose of the proposed development and the requirements of this title, including the following:
1. An allowed use within the zone;
2. Complies with all applicable development requirements of the zone, including building height, setback, front, side and rear yards, and lot size;
3. Respects lot lines of a legally subdivided lot;
4. Complies with the parking requirements for the zone;
5. Conforms with applicable design guidelines, if any, for the zone;
6. Can adequately be serviced by roads, existing or proposed utility systems or lines;
7. Does not infringe on any existing easements;
8. Has permit for a septic system if, required. (Ord. 04-2017, 4-6-2017)
C. Contents Of Application: The applicant shall provide the Meadow Town Council with: (Ord. 2019-3, 9-18-2018)
1. A statement of intended use;
2. Drawings in sufficient detail to allow the Council to review the proposal for compliance with this title;
3. The property identification number assigned by the County;
4. Project identification, location, developer and developers address and contact information;
5. Concept drawings shall be either eight and one-half inches by eleven inches (81/2" x 11") or eleven inches by seventeen inches (11" x 17"), and shall include the following:
a. Property lines and dimensions indicating total site area, gross area of all buildings and structures;
b. North arrow;
c. Proposed buildings or additions.
6. Location of new buildings and structures;
7. Location of existing buildings and structures;
8. Building elevations;
9. Any further information related to site development as requested by Town officials. (Ord. 04-2017, 4-6-2017)
D. Town Council Review And Decision: Once the Meadow Town Council has reviewed the development, the Town Council shall either accept and approve, approve with conditions, or deny the application. (Ord. 2019-3, 9-18-2018)
E. Building Permit: Upon approval of the building and site plan drawings, and payment of all applicable fees, the Town Council shall issue a building permit to the applicant. Building permit fees will be set by resolution.
F. Inspections: The building official or other designated official shall inspect the project during construction through its completion.
G. Rejected Uses: If an application does not meet the criteria set forth above, the Town Council shall notify the applicant, stating specifically which criteria have not been satisfied.
H. Disclaimer: No permit shall be valid if any of the criteria listed in this section have not been met. (Ord. 04-2017, 4-6-2017)