10-3-3: APPLICATIONS FOR DEVELOPMENT:
   A.   Plan Review Process: The Meadow Town Council will review and recommend all applications for development and will determine if all requirements have been met. (Ord. 2019-3, 9-18-2018)
   B.   Application: An applicant for new development shall contact the Town Council to discuss the scope and purpose of the proposed development and the requirements of this title, including the following:
      1.   An allowed use within the zone;
      2.   Complies with all applicable development requirements of the zone, including building height, setback, front, side and rear yards, and lot size;
      3.   Respects lot lines of a legally subdivided lot;
      4.   Complies with the parking requirements for the zone;
      5.   Conforms with applicable design guidelines, if any, for the zone;
      6.   Can adequately be serviced by roads, existing or proposed utility systems or lines;
      7.   Does not infringe on any existing easements;
      8.   Has permit for a septic system if, required. (Ord. 04-2017, 4-6-2017)
   C.   Contents Of Application: The applicant shall provide the Meadow Town Council with: (Ord. 2019-3, 9-18-2018)
      1.   A statement of intended use;
      2.   Drawings in sufficient detail to allow the Council to review the proposal for compliance with this title;
      3.   The property identification number assigned by the County;
      4.   Project identification, location, developer and developers address and contact information;
      5.   Concept drawings shall be either eight and one-half inches by eleven inches (81/2" x 11") or eleven inches by seventeen inches (11" x 17"), and shall include the following:
         a.   Property lines and dimensions indicating total site area, gross area of all buildings and structures;
         b.   North arrow;
         c.   Proposed buildings or additions.
      6.   Location of new buildings and structures;
      7.   Location of existing buildings and structures;
      8.   Building elevations;
      9.   Any further information related to site development as requested by Town officials. (Ord. 04-2017, 4-6-2017)
   D.   Town Council Review And Decision: Once the Meadow Town Council has reviewed the development, the Town Council shall either accept and approve, approve with conditions, or deny the application. (Ord. 2019-3, 9-18-2018)
   E.   Building Permit: Upon approval of the building and site plan drawings, and payment of all applicable fees, the Town Council shall issue a building permit to the applicant. Building permit fees will be set by resolution.
   F.   Inspections: The building official or other designated official shall inspect the project during construction through its completion.
   G.   Rejected Uses: If an application does not meet the criteria set forth above, the Town Council shall notify the applicant, stating specifically which criteria have not been satisfied.
   H.   Disclaimer: No permit shall be valid if any of the criteria listed in this section have not been met. (Ord. 04-2017, 4-6-2017)